FITOUT PROJECTS
 
LOCATION: Sunshine

Affordable Fitouts was given the task of demolishing a former gym site of 1800m2 in Sunshine, restoring it back to an empty shell. This massive fitout de-fit project needed to be completed within 2 weeks and required an enormous amount of labour, resources, bins and coordination to meet this tight timeline.

Where possible when doing defits, we look into recycling and reusing as many materials as possible. All metal was recycled and joinery was.

Works included:

  • All flooring removed
  • Electrical and lighting disconnects
  • Switchboard removal
  • Demolition of all ceilings, walls and doors
  • Removal of amenities and hydraulic cap off
  • Decommissioning and removal of ductwork
  • Make good perimeter wall and
  • Floor grinding

The end result was an empty space, all ready for a new tenant to move into. The client was super happy with the end result and that we met the strict deadline.

Last updated on Sunday, August 16th 2020

Ready to Work with Us?

Find out how our expert team can assist with your gym fitout, restaurant fit outcafe fit outoffice fit outgym fitout,
restaurant fit outbar fit outretail fitout or any other fitout style project.